Results for "Kashmir Ladakh all-weather connectivity"
Asia’s Longest Himalayan Tunnel at 11,578 Feet Is 70% Complete, Gadkari Says Zojila Opens in 6-8 Months
Union Minister Nitin Gadkari said the 13.153-km Zojila Tunnel, built at about 11,578 feet above sea level, is roughly 70% complete and expected to open in six to eight months. Once operational, the Srinagar-Leh route’s travel time through the pass is expected to fall from one to one-and-a-half hours to about 15 minutes, giving all-weather connectivity between Kashmir and Ladakh.